Wholly owned by EDL-Gen (100%). Installed capacity 155 MW. Commercial operation since 1971. One of the seven plants EDL-...
Wholly owned by EDL-Gen (100%). Installed capacity 130 MW. Commercial operation since 2015. Transferred to EDL-Gen in 20...
Wholly owned by EDL-Gen (100%). Installed capacity 76 MW. Commercial operation since 2009. One of the seven plants EDL-G...
Wholly owned by EDL-Gen (100%). Installed capacity 60 MW. Commercial operation since 2000. One of the seven plants EDL-G...
Wholly owned by EDL-Gen (100%). Installed capacity 40 MW. Commercial operation since 2005. One of the seven plants EDL-G...
Wholly owned by EDL-Gen (100%). Installed capacity 45 MW. Commercial operation since 1991. One of the seven plants EDL-G...
Wholly owned by EDL-Gen (100%). Installed capacity 88 MW. Commercial operation since 2015. Transferred to EDL-Gen in 201...
Wholly owned by EDL-Gen (100%). Installed capacity 14 MW. Commercial operation since 2014. Transferred to EDL-Gen in 201...
Wholly owned by EDL-Gen (100%). Installed capacity 6 MW. Commercial operation since 2012. One of the seven plants EDL-Ge...
Wholly owned by EDL-Gen (100%). Installed capacity 5 MW. One of the seven plants EDL-Gen acquired from EDL when it was e...
EDL-Gen holds a 20% share in this joint-venture plant. Installed capacity 1285 MW. Shares acquired in 2019.
EDL-Gen holds a 15% share in this joint-venture plant. Installed capacity 650 MW. Began commercial operation in 2022.
EDL-Gen holds a 25% share in this joint-venture plant. Installed capacity 615 MW. EDL-Gen invested in this plant in 2012...
EDL-Gen holds a 60% share in this joint-venture plant. Installed capacity 520 MW. EDL-Gen invested in this plant in 2012...
EDL-Gen holds a 15% share in this joint-venture plant. Installed capacity 240 MW. Shares acquired in 2019.
EDL-Gen holds a 15% share in this joint-venture plant. Installed capacity 180 MW. Shares acquired in 2019.
EDL-Gen holds a 20% share in this joint-venture plant. Installed capacity 168 MW. Shares transferred from EDL to EDL-Gen...
EDL-Gen holds a 20% share in this joint-venture plant. Installed capacity 150 MW. EDL-Gen invested in this plant in 2012...
EDL-Gen holds a 15% share in this joint-venture plant. Installed capacity 120 MW. Shares transferred to EDL-Gen in 2015.
EDL-Gen holds a 15% share in this joint-venture plant. Installed capacity 120 MW. Shares acquired in 2019.
EDL-Gen holds a 10% share in this joint-venture plant. Installed capacity 100 MW. EDL-Gen invested in this plant in 2012...
EDL-Gen holds a 10% share in this joint-venture plant. Installed capacity 65 MW. Shares transferred from EDL to EDL-Gen...
EDL-Gen holds a 10% share in this joint-venture plant. Installed capacity 64 MW. Shares acquired in 2019.
EDL-Gen holds a 10% share in this joint-venture plant. Installed capacity 36 MW. Shares acquired from EDL in 2018.
EDL-Gen holds a 60% share in this joint-venture plant. Installed capacity 15 MW. Began commercial operation in 2022.
EDL-Gen holds a 20% share in this joint-venture plant. Installed capacity 5 MW. Shares acquired from EDL in 2018.
The first solar power plant in Laos (2017), at Chaengsavang Village, Naxaythong District, Vientiane Capital. EDL-Gen Sol...