EDL-Gen holds a 10% share in this joint-venture plant. Installed capacity 100 MW. EDL-Gen invested in this plant in 2012.
Wholly owned by EDL-Gen (100%). Installed capacity 155 MW. Commercial operation since 1971. One of the seven plants EDL-...
Wholly owned by EDL-Gen (100%). Installed capacity 130 MW. Commercial operation since 2015. Transferred to EDL-Gen in 20...
Wholly owned by EDL-Gen (100%). Installed capacity 76 MW. Commercial operation since 2009. One of the seven plants EDL-G...