XESET 2 HYDROPOWER PLANT

Name of Project Xeset 2
Location River: Xeset, Province: Saravan
Operation date 09/09/2009
Contractor Main: NORINCO
Install Capacity 76 MW
Average Annual Energy 309 GWh/year
Turbines 2 x 38 MW Francis
Project Type Run-of-River
Type of Dam
Catchment Area 391.5 km2
Reservoir Area 20 km2